COLLEGE OF DUPAGE ARCHITECTURE DESIGN + BUILD SUMMER STUDIO

Thursday, July 3, 2014

DESIGN CRITIQUE 02: SYNTHESIS

This week, the students presented five design schemes that represent a synthesis of ideas coming out of the original twelve schemes. 


The goal of this study was to synthesize, or combine ideas into well-developed schemes.  Last week, the students narrowed the 12 original schemes down to five ideas that would be developed.  This week, the challenge was to develop and refine these ideas into nearly final design studies.  Already there is evidence that students are beginning to consider the realities of building this form as a part of the design process.  One team even constructed a full scale prototype of a construction detail for this review.  Several teams had some very convincing detail drawings.
For the most part, each team was able to combine and develop ideas from the previous ‘round of 12’ studies.  A few of the design projects made some big leaps from the previous study just a week prior.  Where teams struggled a little bit was getting the projects to that NEXT level of detail and refinement that is necessary for us to be able to build these projects.

I find that developing design work is often hard for students to grasp.  I am not sure why this is such a challenge.  Perhaps it is a limitation on my part to effectively communicate the expectations.  Perhaps it is related to the fact that developing work is the WORK part of the discipline.  Or perhaps in this case it is related to the challenges of students working together in large teams, which requires communication and physical presence in the studio. My sense is that in this case it is the latter.  As the group size has increased it has become more difficult to keep everyone on the same page.  This is probably just the nature of trying to do large group project, but I will continue to explore ways to make this team work more effectively.

Here is a look at the results of the schemes as they were presented.
SCHEME 01
This scheme was a development of some of the ideas begun by the various radial schemes presented in the first critique.  This scheme was well developed, and we all felt that this could be a very buildable and interesting design scheme to pursue.  We liked the way the interior could be used for an outdoor class, while the exterior of the form focused your attention on the adjacent pond.  There were questions as to the refinement of the roof detail, and if it would be as easy to build as the design team thought.  We were not completely convinced about the aesthetic relationship between the base and the roof canopy form, but we did like the dynamic character of the roof.










SCHEME 02
This scheme was a development of the blocks and ceilings schemes from the previous critique.  We felt that this scheme was the most spatial of the five, and that it effectively created an intimate gathering space.  We were concerned that the scope of this scheme was beginning to exceed the time we have available to execute this with quality.  There was a lot going on in this design, and we felt that maybe it was overly complicated.









SCHEME 03
This scheme was a development and refinement of the spiral scheme from the previous study.  Many students really liked the potential an innovativeness of this scheme.  I was satisfied with the way this scheme had been simplified in plan, however I had serious concerns about how this would be constructed with quality.  The design team had tried to prototype a full scale section, which I very much appreciated, however this design detail model only raised more concerns in my mind about the complexity of this scheme.  Since every bay is unique, this scheme would be a massive undertaking to construct. It is a great scheme for a portfolio, but not the scheme for this class in its maiden voyage.










SCEME 04
This scheme is a formally simplified version of the sectional scheme from the previous study.  This scheme was still my favorite, and the one we have ultimately chosen to pursue.  I appreciate the formal control of the profiles.  I like the way the space is created out of stacked sectional bays, and that each section is defined by a continuous form.  I also like the spatial characteristics of this scheme, including the way in which this occupiable sculpture creates unique and very functional seating for students to gather.  This scheme was not very effectively detailed, and now the challenge become to refine and develop the design details based on this overall formal concept.






 


SCHEME 05
This scheme was a development on the linear scheme from the previous study.  We liked aspects of this scheme, including a concrete base detail that would weigh the structure, as well as the drama of the roof canopy.  Overall we felt that other schemes were more interesting at this point.  There was also a concern as to the size of this project and the resolution of some of the detailing.









AND IT’S A TIE!
At the conclusion of the critiques we voted – and wouldn’t you know – it was a tie between these two schemes.
The Runner Up
 
The Selected Scheme
So, for another hour we had a healthy and robust debate on the merits of each scheme.  I was very proud of the student’s ability to have a candid and frank discussion in a professional manner.  This is absolutely the hardest part of design – making decisions – letting go of good ideas – and prioritizing intentions.  In the end, we re-voted, and the sections scheme was chosen to be developed.
The truth is, either of these final two schemes would have been a good choice.  I do think that we made a good decision that will become a fantastic sculptural space on campus for students to gather.  I also expect that we can execute this scheme with quality.
The next step is to REFINE the design and DEVELOP the construction detailing of this scheme.  It is a process.  The final design is due next week.

Tuesday, June 24, 2014

DESIGN CRITIQUE 01: IDEAS TO DEVELOP

The following is a summary of some of the ideas that we have chosen to continue to explore.

RADIAL
A number of schemes looked at radial, or semi-circular approach to occupying the site. This is probably a natural response to the geometry of the site that we are using for this project.   These schemes explored variations on this same basic half circle site plan.  While this might be an obvious solution for this site, there are several advantages to this approach.  First, we felt that the half circle schemes could create an interesting inside – out quality.  On the inside of the ring a central space is created, and the outside of the ring amplifies views toward the adjacent pond, a key site feature.  We also thought many of these could be easily constructed in wedge shaped modules, pre-assembled in the shop, and then bolted to each other at the time of installation.  This becomes a viable strategy for construction which is a critical consideration for this project.  The students will now attempt to combine these various radial ideas into one or two schemes to develop.


















SPIRAL
This scheme shares a lot of ideas with the radial schemes mentioned above, although it does not have the same radial footprint.  This scheme is perhaps more successful in creating a space to be occupied than some of the radial schemes.  This project was one of the overall favorites in the voting process.  The students will look to either develop this scheme based on the critique, or perhaps combine elements of this scheme with some of the radial design ideas above, in particular ideas related to seating, a weakness of this scheme.







SECTIONAL
This scheme, and the potential it has, is initially very intriguing.  The idea of building a series of ‘U’ shaped geometric sections, incorporating innovative seating elements, and then repeating this shape with variation in linear bays is very exciting to me.  The geometry and proportions need to be refined, but the simplicity of approaching this project as a series of sectional slices has strong potential.  It also, like the radial schemes, presents a very viable construction process.  Each bay could be constructed by a different team of students, and then spliced together on site.  It’s kind of like a sectional sofa (ok, that analogy might kill this design in the eyes of the students) - put the individual pieces of furniture together to create something larger, more dynamic, and in this case spatial.





LINEAR
This scheme was intriguing to all of us because it was one of the few schemes that looked at the linear site movement along the path as a design consideration.   The idea of framing the path is a strong idea.  Also, we liked how this scheme created a space in the center through the overlapping of linear forms.  The geometry of this scheme presented an interesting and unique approach to the site.

 

BLOCKS AND CEILINGS
These projects are really two different schemes, yet we felt that they could somehow be combined into an interesting synthesis.  The ‘blocks’ scheme was interesting in the way it creates creative seating opportunities.  It is perhaps a little busy, and over designed, but the potential for a blocky, occupiable “landscape” of seating elements is a very interesting idea.  We thought this would create a very successful gathering space for students to hang out.



 
The ‘ceiling’ scheme is exploring a dynamic canopy of linear, block like elements. It explores the use of simple forms to achieve a dynamic character through repetition and variation.  There are some structural concerns, however we liked the way this design created a dynamic form through the use of simple repetition.  Where this scheme falls short is in the human aspect - the seating elements below.  Where the ‘block’ scheme falls short is in the exploration of canopy.  Perhaps these two could combine?  Students will be exploring this synthesis in the next study.


 

DESIGN CRITIQUE 01: MULTIPLES

How does the design process change when my students know they will be held accountable to build what they design?  That is one of the fundamental questions that I am interested in with this course.  Hopefully, this understanding that this structure will be built (by this class this summer) will lead to a more careful attention to the art of building as a fundamental aspect of the design process.

This past week, students submitted their first design studies for the Architecture Design Build Summer studio.  I have asked the students to consider form, space, tectonics and constructability throughout the entire design process. 
 



The intent of this first design study “MULTIPLES” was to get students working in teams, and to produce a variety of concepts and approaches to the design of the gathering space pavilion.  These are first studies, and as such they are valuable for getting ideas down on paper and giving the class a point from which to develop their work.  Design variety and multiple options allowed us to begin to make some decisions about design potential, and what we might want this project to become.  Students were grouped together in four teams of four persons.  Each team produced three design schemes for a total of twelve. 

 

During the first critique, we discussed each of the twelve projects in detail.  As a group we identified the strengths and weaknesses for each scheme.  At the conclusion of the critique, we discussed how we might proceed as a class, and began the difficult process of eliminating schemes.  As with any design project, it is necessary to prioritize, edit, and ultimately discard good design ideas to be able to move forward and develop the work.
 

To assist this process I had students each vote using colored sticky dots.  Each student voted for four projects; the most successful formally, the most successful spatially, the project that best considered tectonics and the project that was the most constructible or feasible.  The dot voting technique was primarily useful as a discussion generating tool by revealing patterns in how the students felt about the work.  It helped us to identify several projects with strong potential, and others that might be combined into single schemes.
The class now must synthesize and develop these ideas into 4 design schemes for next week.